|
New Page 1
|
HIMATMOverview |
|
- Uniqueness |
|
- 5 Step Process |
|
HIMATM Step 1 |
|
HIMATM Step 2 |
|
HIMATM Step 3 |
|
HIMATM Step 4
|
|
HIMATM Step 5
|
|
Benefits
|
|
New Version 6.8
|
|

|


|
 |
HIMATM
Step 2 - Approach
What is the condition and/or
the integrated condition?
Silo Approach
Harfan helps municipalities put together a complete picture of the condition
of all of their networks. The Harfan CIP condition assessment and rating
module uses a highly structured process.
Integrated Approach
Due to the close proximity and
high level of interaction between infrastructure networks, cost-effective
decisions on asset rehabilitation require an integrated approach. Harfan’s
innovation lies in evaluating water, sewer, and road networks by considering
their high degree of spatial interaction. Knowing the condition of these
networks as a whole is an incredible trump card for municipal administrators.
Approach
-
Strategic counseling based on
industry standards and best practices. The Harfan CIP
Builder calculates a network’s current condition, assesses the risk, and
determines the gap between the two.
-
Uses powerful, precise
mathematical algorithms to produce a single, comprehensive assessment and
rating of a network’s condition based on multiple criteria, including
physical and functional integrity, socioeconomic impact, and risk.
-
The Harfan CIP Builder rates an
asset’s current condition using criteria such as pipe breakage history,
defects, events (such as sewage backups), physical configuration (frost
line, spatial position), environmental conditions (such as soil
aggressiveness), and action effects (bus lines)
-
Evaluates unassessed assets
based on the performance of similar assets to minimize the need for
inspection.
-
Determines the need for each improvement
through integrated condition assessment.
-
Can be custom-calibrated for the
organization as part of Harfan’s ongoing commitment to excellence.
|
Software Features >>
|
Step 2 Benefits >> |
|