MenuSecondaire
 Site Map  Career  Français  Home
  Harfan Infrastructure Management Approach


 

 


 


 

Type:
Naval Base

NETWORK MANAGED:
Water, Wastewater, Roads and Steam Loop


AREA STUDY:
Dockyard Area

 

 

Case Studies


National Defence of Canada, NS, CAN


How we optimized their asset management

With the objective of rehabilitating the water, sewer, road and steam networks, this area study consisted of producing a mid to long term Integrated Capital Improvement Plan (ICIP), complete with a condition assessment of the studied assets. Using Harfan's Infrastructure Management Approach (HIMATM), DND optimized the rehabilitation of its assets, extended their service life and reduced the costs of ownership.

Many times proven, DND gained from Harfan's knowledge based methodology and software solution, maximizing Harfan's Integrated Decision Support System (IDSS
TM), to produce an Integrated Capital Improvement Plan.

The deliverables to the Department of National Defence of Canada included:

  • Integrated planning of improvements and renewal of road, water, sewer and steam infrastructure networks;

  • Increasing DND knowledge of the integrated condition of road, water, sewer, and steam networks based on physical, functional, related assets and socio-economic analysis;

  • Determining the short, medium and long term needs for infrastructure renewal; and;

  • Knowing where, when, how and how much, DND should allocate funds on water, sewer, road and steam networks to maintain these networks at an adequate level of service.

HIMATM enabled DND to strategically plan their asset repair & replace programs while acknowledging specific technical, operational and budgetary considerations.
 

Learn more about Harfan's Approach 
More Business Cases

 

 
© 2008 Harfan Technologies, Inc.


All rights reserved